Preliminary Engineering Report
A Preliminary Engineering Report (PER) is a required first step for all construction projects. Its purpose is to look at whether the project is doable, affordable, and environmentally responsible before any final design or building begins. The PER helps project teams, funders, and others decide if the project makes sense. Think of it as a roadmap that guides the project in the right direction before moving forward.